◎Removing and installing/replacing inlet and exhaust adjustment units.
◎Checking camshaft timing, and adjusting timing.
◎Applications:
N63 ENGING
5’(F07/F10/F11),
6’(F12-650i(EUR 09-14), F12-650i(USA 10-14), F12-650iX(EUR10-14), F13-650i(EUR/USA 10-14) , F13-650iX(EUR10-14))
7’(F01,F02-750Li(EUR/USA 07-14), F02-750LiX(EUR07-14/USA 08-14),F02-ALPINA B7L ( 09-14) , F02-ALPINA B7LX( 10-12)) X’(E70 EUR/USA 09-13),E71(EUR/USA 07-14),E72(EUR 09-11,USA 08-11)
S63 ENGINE : X’(E70 EUR/USA 08-13),(E71 EUR/USA 08-14)
沒有留言:
張貼留言